First, John grouted the tiles last Saturday, which we rigorously cleaned three times every 15 minutes to get all the excess off and then let dry. It really made them look complete!
Unfortunately, the rest of the main floor turned into a disaster zone, as John had to move everything he needed (or things that where just in the way) into the living and hallway. We cleaned it up on Sunday after picking 12L of strawberries!! (We got sidetracked from the work that needed to be done :) )
Not as bad as Wednesday, but still bad enough! |
This is missing 2L, which I left out for us to eat. This sink full has since been frozen. |
Yesterday was a pretty productive day. John ripped off all the trim (as he got mortar all over them) before breakfast. After breakfast we put the first coat of the varathane on the shoe shelf and then made a run to Home Depot to pick up new trim and a couple of things we needed. I'm pretty sure the staff there know us all by name...
Once we got back, I got set up to iron the veneer onto the bench and did the second coat of varathane on the shoe shelf, while John cut and put the trim on the bench and in the entrance.