Since John has taken this week off to get some work done on the house, I will have lots of things to blog about each day!  Yay!!

I do not have too much to say about today, other than it was somewhat productive for John.  He was able to get the walls and ceiling painted and ripped up all the tile in the front and fixed the light switch in the basement.  I say that he was only somewhat productive, because it took him most of the afternoon to get the light switch fixed in the basement because it is a three way switch and he had to keep running up and down the stairs to check it, which would have been my job had I been home :)  Here are some pictures of what`s been done today. 

Freshly re-painted wall and ceiling.

There used to be a big rip mark in the centre where the old
closet shelf was.

Tile all ripped up.






The pile of tile on the front step.
We`re planning on going out to Lowe`s later this evening to pick out the new tile for John to lay down tomorrow, along with the other things John needs.  Until tomorrow....

No comments:

Post a Comment